Preventive | Management

  • Fahrenheit consultors. Gestión Preventiva. Seguimiento


Once the corrective and preventive measures are implanted, our client will decide if he needs our support in the efficiency control´s tutelage regarding measures. To that end, our professional team will investigate and analyse the prevention Plan´s level of fulfilment and its level of effectiveness for risk elimination.


Register of detected failures in the Prevention Management System:

  • Investigation of accidents and incidents.
  • Actions done in work-related accidents.
  • Register of absenteeism in order to create a Professional Sickness Catalogue.

Actions before changing situations that can be predictable and if they are not controlled at the right time, they may represent risks to the workers or third-parties.

  • The choice of work equipment, substances or chemical preparations, the introduction of new technologies or the modification of the amendment in workplaces.
  • Changing of work conditions.
  • The incorporation of a worker whose personal characteristics or his known biological statement make him especially sensitive to the work conditions.
  • Preventive projects applied to the design phase of new installations, processes, substances, etc.
  • Procedures of purchase and machinery acquisition, work equipment, substances, etc., which take into account the minimum required condition to prevent new risks.
  • Coordination of business activities. Actions.
All the compile information will be analysed and its result will be reflected in a report where the existing problems and their possible consequences will be detailed. In addition, the new preventive and/or corrective measures in a continual improvement process must be included in the report.

Taking into account:
1. QUANTIFY THE DETECTED IRREGULARITIES.
2. VISUALIZE THE ECONOMIC AND SOCIAL COST THAT THE WORK-RELATED ACCIDENTS WOULD SUPPOSE.
3. HOW TO CORRECT THE SITUATION WITH THE MINIMUM COST.